Before a retrofit: establish an energy and water baseline

How building owners and facilities teams can organise consumption records and measurement boundaries before comparing options or assessing improvements.

02

What will you learn?

  • Define the meters, areas and loads being compared.
  • Review physical consumption, not just the bill amount.
  • Assess savings through an explained comparison, not a guaranteed percentage.

1. Fix the boundary and period

Decide whether the study covers a whole building, a cooling system or one floor. Connect every meter to the areas and loads it serves. As a preparation step, collect 12 consecutive months of bills where available to understand seasonality; the project may need a different period or additional data under an appropriate measurement and verification plan.

Sources for this section: [1]

2. Build a record of actual operation

Bill amounts can change because of tariffs or charges. Separate consumption quantities from costs, and record influential changes rather than treating every decrease as improved efficiency.

  • Electricity in kilowatt-hours and water in cubic metres, with reading dates.
  • Purchased cooling or other energy supplies in their original units.
  • Covered areas, occupancy, operating hours and patterns of use.
  • Relevant weather data, faults, leaks and equipment changes.
Sources for this section: [1][2]

3. Use an indicator without calling it certification

Hypothetical teaching example: a building uses 240,000 kilowatt-hours over one year within a defined boundary and has a covered area of 2,000 m². Electricity intensity is 120 kWh/m²/year. This is an arithmetic indicator, not proof of efficiency or a green rating. Comparisons require consistent area definitions and included loads.

4. Agree how improvement will be demonstrated

Document the pre-intervention condition, measure scope, meters, data accuracy and treatment of changes in occupancy or weather. Compare post-installation records with an appropriate baseline after justified adjustments. Investigate operations, leaks and meter records when consumption changes unexpectedly, and involve the utility if meter accuracy is in doubt.

Sources for this section: [1][2]

Assumptions and scope

  • The example is hypothetical; the meter and stated area cover the same boundary for one year.
  • The suggested preparation period does not replace a project-specific measurement and verification plan.

Limits of interpretation and use

  • This guide does not determine building permit requirements or award environmental certification.
  • No saving percentage is guaranteed; results depend on conditions, measures, measurement quality and operation.

References & editions

  1. Measurement and Verification Protocol ↗

    Regulatory and Supervisory Bureau for Electricity and Water — Dubai · January 2014; methodological reference, not a statement of current permit requirements

    Accessed:
  2. Consumption Verification — Electricity / Water ↗

    Dubai Electricity and Water Authority (DEWA) · Live service guidance; no edition date shown

    Accessed:
Introductory material · Independent technical review not yet documented

These guides were prepared with AI assistance and the listed references. They support reading and learning; no approval or review by Dr. Sherif is claimed before it is documented.

Editorial & review policy ↗Suggest a correction
Services

Turn the guide into a suitable project step.

Discuss your facility or project data with the team to agree the appropriate service scope, requirements and deliverables.

Editorial & review policyGlobal Green Consults · globalgreenconsults.com