A vision rooted in the land.

An agricultural and learning project in Al Samhah, Abu Dhabi, connecting production, resource efficiency and practical knowledge.

Discuss the project
Conceptual site rendering from the farm development document
Conceptual rendering from the project document; final design is subject to review and approval.

A farm that learns and grows.

Abu Dhabi Green Regenerative Farm is conceived as an agricultural site bringing together soil health, honey production guided by Industry 5.0 principles and capacity building within a circular economy, targeting integrated AI control supported by drones, robots and data-informed resource management.

We aim to turn field experience into knowledge that can be documented and improved. Development starts with assessment and design, followed by operational trials and expansion informed by results.

Explore the site and practices
Development and delivery guide · 7 connected phases

From establishing rights to a scalable operation

A detailed roadmap drawn from the supplied executive guide: the work in each phase, its deliverables and the decisions required to progress. Engineering, agriculture and qualification may overlap according to delivery plans and approvals, while monitoring and improvement continue throughout the project.

A development plan, not a completion record

The areas, facilities, technologies and qualifications below describe the intended concept to develop and validate; they do not establish issued permits, certifications or carbon credits. The annual operating target remains AED 20 million, with carbon income assessed separately as an additional opportunity.

Open each phase to explore its workstreams and deliverables.

01
Phase 1

Legal foundation, permissions and governance

Development begins by establishing rights, responsibilities and the entity managing, contracting and operating the farm before committing to design and delivery.

1.1 · Land ownership and legal position

Compile title, use-right and survey documents for the Al Samhah site in Abu Dhabi, with a document-stated reference area of 27,871 m². Review land use, setbacks and competent-authority requirements, identifying activities requiring separate permissions.

1.2 · Management and operating entity

Define the legal structure and owner, developer and operator authorities, alongside operations, quality, safety, certification, finance and monitoring, reporting and verification (MRV) roles. A responsibility matrix records decisions, reviews, escalation and the administrative and consulting delivery partner’s scope.

1.3 · Operating contracts and carbon rights

Prepare management, development and operating agreements covering exclusivity, duration, performance and fees. Document carbon and data rights, sale rights, benefit and cost sharing, and permanence obligations, including potential participating farms without assuming automatic transfer of their rights.

1.4 · Permissions and compliance register

Create an activity and facility register identifying the authority, documents, status and renewals. Coordinate agricultural and food requirements with ADAFSA and relevant environmental, water-source, well, treatment and recycling requirements with EAD, according to each activity’s scope.

Phase deliverables
Documented legal file, authority matrix, draft agreements and a permissions register with assigned follow-up.
Review checkpoint
Establish development and operating rights and authority requirements before delivery commitments.
02
Phase 2

Environmental surveys, baseline and MRV protocol

Establish a reliable record of land, water and emissions before intervention so later results can be compared and reviewed.

2.1 · Topographic survey and soil/water testing

Survey boundaries, levels, drainage and existing services. The document’s approximate 182.9 × 152.4 m dimensions require reconciliation with the cadastral survey. Test physical, chemical and biological soil properties and irrigation-water quality and salinity, including EC and TDS.

2.2 · Operating boundaries and emission sources

Define the operating entity, activities and data sources, distinguishing direct emissions, purchased energy and relevant value-chain emissions across Scopes 1, 2 and 3. Separate the organisational inventory from the carbon project’s boundary and methodology to avoid mixing or double counting results.

2.3 · Operational baseline and soil carbon

Use ISO 14064-1 for organisational inventories and ISO 14064-2 for reduction/removal projects. Design SOC sampling, bulk-density and depth measurements and comparison plans under the chosen applicable methodology, such as VM0042. Assess eligibility of vegetation carbon pools separately rather than automatically including them in soil credits.

2.4 · MRV protocol and data quality

Define management units, sampling points, monitoring frequency, collection responsibilities, calibration, analysis and evidence retention. The dMRV platform connects sensors, weather, drone and field records with laboratory results, with access controls, backups and uncertainty management. Digital tools support, rather than replace, required sampling and independent verification.

Phase deliverables
Survey maps, laboratory results, baseline report, sampling plan, data dictionary and auditable MRV protocol.
Review checkpoint
Confirm data quality and comparability before approving improvement results or carbon quantities.
03
Phase 3

Regenerative masterplan and green facilities

Translate survey results into a coordinated plan for production, agriculture, water, energy, learning and circulation, subject to detailed design and authority review.

3.1 · Agricultural and functional zoning

Organise suitable native-tree windbreaks, including ghaf, sidr and arak, alongside crops, vegetables, palms, intercropping and bee forage. Allocate recycling, compost and biological-input zones, and assess rotational grazing and livestock integration against land, water, safety and permissions.

3.2 · Precision irrigation and the water cycle

Design drip and subsurface irrigation where appropriate, linked to soil moisture and weather, with suitable runoff harvesting. The document targets over 40% reduction in water losses, requiring baseline and field validation. Separate wastewater streams and define treatment and reuse by water type, quality and authorised use.

3.3 · Green infrastructure, manufacturing and smart control

The concept includes Industry 5.0-oriented honey processing and robotic sorting/packing, a quality laboratory and batch traceability, training centre, separate lodge, worker housing, stores and an AI Hub. These connect to a recycling station designed and operated to deliver green circular-economy objectives, ASP composting, water treatment, sensors, weather stations, drones and rooftop/canopy solar with load and storage studies.

3.4 · Land allocation and building footprint

The detailed schedule proposes 2,118.20 m² of enclosed building footprint, approximately 7.60% of the site. The remaining 25,752.80 m² includes fields, windbreaks, roads and composting; it is not all eligible agricultural carbon area. This planning ratio establishes neither a statutory allowance nor carbon additionality.

3.5 · Climate orientation, circulation and indoor quality

Review sun, wind, setbacks and odour dispersion before fixing treatment locations; the northwest corner is not automatically downwind of northwesterly winds. Target external parking, light electric transport, perimeter loading and safe permeable routes. Separate service areas from soil sampling and specify suitable low-emission materials, insulation, shading, ventilation and filtration.

Proposed facility and area schedule

The schedule below follows the attachment’s detailed table labelled as the latest update. Some sketch figures and earlier descriptions differ; reconcile dimensions, areas and locations in one coordinated plan before execution approval.

Whole site27,871.00 m²
Proposed enclosed footprint2,118.20 m²Approximately 7.60% of site
Remaining allocations25,752.80 m²Agriculture, services and circulation
Enclosed facilities · planning areas in square metres
Facility and areaProposed locationConcept and function
Vocational and environmental training centre650.00 m²Southern frontage near the entranceLearning ring and courtyard, rooms, workshops and laboratory; reconcile diameters and floor areas in detailed design.
Honey facility and quality laboratory300.00 m²Northeast site perimeterEight-cell hexagonal concept, controlled production flow, hygiene zoning and perimeter loading.
Sustainable owner’s lodge300.00 m²Southeast sectorOrganic-leaf concept, privacy, shading, insulation and indoor environmental quality.
Worker housing and sanitary facilities300.00 m²Western service sectorAdaptable modular arc, separate from the lodge, with safe living spaces and suitable ventilation.
Machinery store and workshop150.00 m²Western sectorStore, maintain and calibrate minimum/no-till machinery.
AI Hub and dMRV control room138.20 m²Central connection between learning and fieldsManage sensors, irrigation, data and records; specify insulation and cooling from equipment loads.
Biological-input store100.00 m²Southwest sectorAppropriate storage conditions, batch traceability, segregation and contamination prevention.
Water treatment and reuse station180.00 m²Adjacent treatment zone, subject to assessmentAssess MBBR, filtration and disinfection against water characteristics and reuse permissions.
Scheduled footprint total2,118.20 m²
ASP recycling and composting unit
300.00 m²

Proposed treatment area; review construction/environmental classification and monitor CH₄/N₂O, odour and leachate.

Routes and logistics apron
2,100.00 m²

Coordinate facility access, walking, emergency routes and perimeter loading; verify swept paths.

Tree windbreaks
3,650.00 m²

Perimeter planting with indicative 5–8 m widths; reconcile area and orientation in the plan.

Regenerative fields and bee forage
19,702.80 m²

Crop, cover and apiary sectors; establish eligible carbon-accounting area separately.

Solar is proposed on roofs and parking canopies without additional ground allocation in this table, subject to load, available-area, structural and storage studies. Area classification and building allowances require authority confirmation. Estidama assesses buildings; Verra registers carbon projects and issues credits. Neither confers the other.

Explore the full facility directory ↗
Phase deliverables
Coordinated masterplan, area schedule, CAD/BIM drawings, water and energy balances, specifications, quantities, circulation and permitting plans.
Review checkpoint
Reconcile areas, dimensions and disciplines and approve the design; organic forms or solar alone do not establish performance or certification.
04
Phase 4

Regenerative practices and the five-year agricultural transition

A staged programme starts with trials and adapts to soil, crop and water responses rather than assuming one package works across the whole farm.

4.1 · Rebuilding soil and biological function

Apply no-till or minimum tillage where suitable, diverse cover crops, mulch, mature compost and validated biological inputs. Balance species selection across cover, roots, diversity, salinity and water demand, measuring effects on organic stocks, soil structure and production.

4.2 · Biodiversity and integrated pest management

Create ecological corridors and refuges for pollinators and beneficial species, monitoring pests and intervention thresholds. Target lower reliance on synthetic inputs and suitable permitted alternatives, documenting crop-protection and food-safety interventions; organic claims depend on certification.

4.3 · Digital traceability and seasonal improvement

Link each field to seed, input, irrigation, operation, harvest, outcome and cost records. Begin with baseline and trials, then integrate irrigation/sensors, commission facilities and assess performance, close certification gaps and reach independent review and an expansion decision over five years. Adapt sequencing to evidence; it is not a guaranteed carbon-issuance timetable.

Phase deliverables
Seasonal farm plan, traceability records, comparative trials, water/soil/production/cost indicators and an annual five-year-plan review.
Review checkpoint
Scale practices demonstrating agricultural, water and financial suitability.
05
Phase 5

Local and international agricultural and environmental qualification

Select certifications by actual activities and target markets, with evidence and accountable owners for each pathway, rather than treating every credential as one requirement or an existing achievement.

5.1 · Local pathways and operational quality

Assess UAE organic-production and suitable good-agricultural-practice pathways, food activities and apiaries. Coordinate Estidama building ratings separately from carbon registration, developing food-safety procedures such as HACCP and ISO 22000 and export readiness for the actual facility and market.

5.2 · International pathways matched to scope

Assess GLOBALG.A.P. and Regenerative Organic Certified Bronze, Silver and Gold pathways, including an accepted organic foundation and applicable soil-health, animal-welfare and social-fairness requirements. Assess EOV and Land to Market for eligible systems; this verifies ecological outcomes and is not assumed applicable to pure cropping. Explore training partnerships with a specified institution such as IHK or HWK under a defined agreement and scope.

5.3 · Gap analysis and independent audits

Maintain gaps, evidence, policies and procedures, identifying each pathway’s costs, timing and certification or verification body. Conduct pre-audits, site visits and traceability review, close findings and retain issued credentials, scope, validity and renewal dates. Use marks and claims only within authorised scope.

Phase deliverables
Activity-linked qualification matrix, gap analysis, audit plan and credential register distinguishing requirements, applications and actual achievements.
Review checkpoint
Publish certification claims only with issued, valid evidence matching the project scope.
06
Phase 6

Decarbonisation plan and carbon-credit project development

Operational efficiency and credit development are connected but separately accounted for: solar power and registration alone establish neither neutrality nor carbon income.

6.1 · Carbon budget and reduction plan

Identify emission sources and priorities and improve irrigation, energy, transport, inputs and waste management. Review removals, emissions, boundaries and reversal risks annually before neutrality or carbon-negative claims, preventing incompatible claims or sales of the same outcome.

6.2 · Project description, eligibility and aggregation

Prepare project description, baseline and monitoring plan under an applicable programme such as Verra VCS and VM0042 when eligible, demonstrating additionality and assessing leakage and non-permanence. A grouped project can add farms within defined boundaries, eligibility rules and contracts, expanding measurement without duplicate land or credit registration.

6.3 · Independent validation and verification

Have a qualified independent validation/verification body (VVB) assess project design and subsequently verify monitoring-period results, sampling data, calculations and evidence quality. Sampling and verification frequency follow the applicable methodology and accepted plan; sensor readings or annual analysis do not imply automatic annual issuance.

6.4 · Registration, issuance, sale and collection

Complete account and registration procedures, then seek verification approval and unit issuance under programme rules. Record unit identifiers, ownership and status, distinguishing transfer, sale and retirement. Carbon income remains outside the AED 20 million operating target, based on issued and sold units, contract price and project share, with costs and net returns disclosed.

Carbon measurement, farm aggregation and income details ↗
Phase deliverables
Reduction plan, carbon project description, rights and aggregation file, review/verification reports and issuance/sale records when completed.
Review checkpoint
Eligibility, validation, registration, monitoring, verification, issuance and sale are distinct steps; later milestones require their own evidence.
07
Phase 7

Operational continuity, corporate reporting and knowledge transfer

The farm becomes an operation that learns from its data, maintains delivery quality and documents practices transferable to other dryland farms.

7.1 · Environmental and ESG reporting

Prepare annual reporting connecting water, energy, emissions, soil health, biodiversity, production and waste to defined indicators, baselines, boundaries and methods. Include safety, worker welfare, training and governance, distinguish measured results from targets and disclose findings and improvement plans. Maintenance, calibration, permission renewals and data quality support continuity.

7.2 · The farm as a demonstration and knowledge hub

Document case studies, training materials, field days and reviewable data while protecting intellectual property, farmers’ rights and privacy. Assess replication and new-site inclusion against outcome quality, feasibility and delivery capacity, supporting the knowledge economy, food security and Abu Dhabi/UAE climate goals.

Phase deliverables
Annual impact report, operating dashboard, improvement and maintenance register, case studies, training materials and evidence-led expansion plan.
Review checkpoint
Link expansion decisions to independent results, resources and clear rights, with continuing performance review.

Delivery sequence and five-year horizon

These phases connect to the foundation/design packages and agricultural transition programme below. Confirm dates, responsibilities and budgets at appointment and detailed planning.

View the delivery programme ↗
Purpose & value

Land, people and technology working together

The document proposes developing the farm in Al Samhah as a production, experimentation and training site, improving the agricultural asset and documenting knowledge for comparable environments.

01

Why regenerative agriculture?

The vision starts with soil’s capacity to support plants, manage water and retain organic matter. Reduced disturbance, plant diversity, compost and integrated pest management are linked to repeated measurements, distinguishing lasting improvement from seasonal or operational variation.

02

Why combine multiple activities?

Bringing fields, bees, honey processing, the recycling station and learning together enables exchanges of materials, data and expertise. Suitable residues return to soil after treatment, field observations inform teaching, and operating problems become documented improvement trials.

03

Local value & transferable knowledge

The project aims to develop farmers’, technicians’ and engineers’ skills while improving production quality and resource use. It records successes and necessary adjustments in dry and saline conditions to build a demonstrator supported by reviewable results.

04

A climate ambition measured in stages

Carbon neutrality and better climate performance are development ambitions. Work begins with an inventory and reductions in consumption and emissions, followed by eligible removals. The site does not describe the farm as carbon-neutral or carbon-negative before its accounting boundaries and results are established.

National relevance: knowledge that produces food and value

In line with Abu Dhabi’s direction towards a knowledge-based economy and the UAE Net Zero by 2050 strategic initiative, the project combines regenerative agriculture with Industry 5.0. It connects food security with local expertise, and resource efficiency with measurable economic opportunities, seeking to close resource loops wherever technically and environmentally feasible.

This direction supports the aims of the UAE AI Strategy 2031 through field, factory and learning applications: high-value local production, Emirati skills for green jobs, and documented processes and data that can support replication. Industry 5.0 is approached through sustainability, resilience and human-centred development, with advanced automation guided by qualified specialists.

The concept extends from the central farm to a 1,000-hectare Grouped Project, with data and services coordinated from the Abu Dhabi command hub. It aims to support the National Food Security Strategy 2051 through local production, agricultural technology and resource efficiency, documenting farm participation and measuring implementation outcomes.

National Food Security Strategy 2051 ↗
UAE AI Strategy 2031 ↗

Industry 5.0 principles — European Commission ↗

Project governance

Clear responsibilities, documented decisions

Management distinguishes asset ownership, technical development, operations, quality and independent verification, with agreements, authority levels and decision records established before activities begin.

01

Owner & capital partner

Confirm land title, use rights, investment scope and funding, and approve the project, budget and payment stages. Agreements define ownership of equipment, improvements, data and carbon rights, as well as each party’s obligations.

02

Development & technical management

Coordinate studies, design, permissions, procurement and learning programmes, connecting construction choices to operations and measurement. The document identifies Global Experts for Industrial Development and Green Consultations as the project proposal and coordination entity.

03

Operations, quality & safety

Manage fields, bees, facilities and maintenance, recording inputs, output, costs and training. Quality management includes internal checks, corrective actions, risk and emergency arrangements, and separation between data preparation and review.

04

Proposed cooperation models

The document considers advisory and development work, operating management, or a combination with an agreed performance incentive. Deliverables, fees, indicators and responsibilities are contractual, with the operator separate from the certifier or independent verifier.

From study to operation

Two connected development programmes

The plan combines near-term engineering packages with a five-year agricultural transition. These are indicative sequences starting from actual commissioning and adapting to approvals, resources and results.

Foundation & design packages

01

Surveys & baseline

Survey, soil and water testing, activity mapping and initial data collection.

Weeks 1–3
02

Masterplan & infrastructure

Facilities, planting, circulation and water, energy and utility networks.

Weeks 3–5
03

Architecture & structure

Buildings, envelope, shading and materials coordinated with operating requirements.

Weeks 5–8
04

Building & utility systems

Electricity, cooling, ventilation, irrigation, treatment, solar and protection systems.

Weeks 7–10
05

Digital control & MRV planning

Sensor layout, data flows, calibration, records and review checkpoints.

Weeks 9–11
06

Review, permissions & procurement

Authority submissions, specifications, quantities and technical bid review.

Weeks 11–13

Five-year agricultural transition horizon

  1. Year 1

    Establish evidence & trial practices

    Establish baseline conditions, trial cover crops and reduced tillage, and record the starting position.

  2. Year 2

    Integrate irrigation & sensors

    Improve water management and connected readings; assess livestock integration before introduction.

  3. Year 3

    Commission facilities & assess performance

    Expand honey, compost and service trials and measure the cumulative effect of practices.

  4. Year 4

    Close gaps & prepare for audit

    Review records and controls, address findings and select certifications matching actual activities.

  5. Year 5

    Verification & expansion review

    Independently assess outcomes and expansion or aggregation options; credit issuance depends on eligibility and programme procedures.

Reviewable deliverables

Rights and approvals register • Survey and soil/water results • Baseline report • CAD/BIM and coordinated services • Specifications and quantities • Operations, maintenance and food-safety manuals • Monitoring and data-quality plan • Learning materials and certification register.

Project economics

Multiple value streams, testable assumptions

The document contains an initial model linking training and advisory work with honey, crops and resource recovery. Its figures explain the concept and require market research, approved design, quotations and detailed cash-flow modelling.

Updated revenue target

Target annual revenue approaching AED 20 million after final opening

This expresses the project’s updated commercial ambition and requires a new financial model detailing revenue sources, sales volumes, pricing, capacities and ramp-up. It does not establish net profit. The target excludes carbon-credit sales, assessed as separate additional income linked to soil-stock measurement and eligible land at the farm and participating farms, verification, issuance and sale. The capital estimate below is an earlier estimate requiring review against the updated scope.

Concept estimate in the document
8.5million AED

An indicative capital estimate, not a contractual budget or confirmed funding. Updating it requires consistent areas and equipment scope, working-capital and contingency details, and appropriate financial treatment.

Capital allocation in the initial model
ComponentAED million
Training centre & fit-out4.05
Industry 5.0 honey facility & apiary1.50
Smart farming & carbon measurement1.15
Recycling station & compost0.90
Private environmental lodge0.90
Indicative total8.50
Watch & explore · Development & coordination

Meet Global Experts

Meet the project coordination company and explore its work in development, feasibility, engineering, operations and sustainability.

2:34Global Experts channel
Explore the company channel
Watch on YouTubePlayer loads on click

Educational content from the company channel; not evidence of completed farm works or awarded certification.

From planning to practice

We develop in stages, guided by feasibility, evidence and approvals.

Explore a partnership